Skip to main content

DaimlerChrysler AG shareholders' meeting

DaimlerChrysler AG Hauptversammlung
1999
Stuttgart
Corporate Event

In the main hall four 8gv projectors and five cameras had been used. The distribution of the signals was achieved via a control desk in the transmission van. The speakers’ desks were equipped with 12"-TFT-displays. In addition the complete shareholders’ meeting was broadcasted on nine video walls and 120 TV screens in a camp that had especially been built for that event. Fiber optic cables and HF-circle wiring were the link to the transmitting station.